spot_imgspot_img
spot_img

USBRL Provides All-Weather Connectivity to Kashmir, Opening New Market Opportunities for Farmers and Small & Medium Enterprises: Ashwini Vaishnaw

Date:

Vinod Bhat

New Delhi: To provide connectivity of Kashmir valley to rest of India, Udhampur-Srinagar-Baramulla Rail Link (USBRL) project (272 Km) has been commissioned. USBRL project covers the districts of Udhampur, Reasi, Ramban, Srinagar, Anantnag, Pulwama, Budgam and Baramulla of Jammu and Kashmir.

The USBRL project is one of the most difficult new railway line projects undertaken in the country post-independence. The terrain passes through young Himalayas, which are full of geological surprises and numerous problems. In this project, Railway has made the world’s highest Railway Bridge over Chenab river in Reasi district of Jammu & Kashmir. The iconic Chenab Bridge is 1315 m long having Arch span of 467 m and height of 359 m above river bed. Indian Railway’s first cable stayed bridge has been constructed across Anji Khad in this project. It is 473 m long asymmetrical cable stayed bridge with single Pylon of 193m height with inverted “Y” Shape.

Apart from providing rail connectivity, about 215 km (including a tunnel and 320 bridges) of roads have been constructed which are used by local population.

The entire rail project is electrified using a overhead conductor system in tunnels and in open stretches. With the all-weather, reliable and comfortable rail connectivity of valley portion with rest of the Indian Railway network, tourism will get a big boost.

After commissioning of the project, the travel time between Katra and Srinagar has been reduced to just about 3 hours.

The USBRL project has made substantial socio-economic contributions to the region. The integration of USBRL project with Railway Network has facilitated transportation of raw materials and finished goods, supporting the growth of small and medium-sized enterprises in the region. Farmers and local businesses are now able to sell their signature Kashmir products such as apples, dry fruits, pashmina shawls and handicrafts beyond the region, providing access to larger markets and promoting economic diversity.

To improve rail connectivity in Jammu and Kashmir, following Final Location Surveys (FLS) have been sanctioned:

SN Name of Project Status
1 Jalandhar Cantt. – Jammu Tawi (216 Km) 3rd line Detailed Project Report (DPR)has been prepared
2 Jammu – Shri Mata Vaishno Devi Katra Additional Line (78 Km) FLS sanctioned for preparation of DPR. Field survey has been taken up.
3 Jammu/Reasi – Poonch New Line  (190 Km) FLS sanctioned for preparation of DPR. Field survey has been taken up.

 

After preparation of DPR, project requires consultation with various stake-holders including State Governments and necessary approvals viz. appraisal of NITI Aayog, Ministry of Finance etc. As consultation with stake-holders is a continuous and dynamic process, exact timelines cannot be fixed.

Amrit Bharat Stations:

Ministry of Railways has launched Amrit Bharat Station Scheme for redevelopment of stations with a long-term approach.

The scheme involves preparation of master plans and their implementation in phases to improve the stations of Indian Railways. The master planning, keeping in view the necessity of each station, includes:

  • Improvement of access to station and circulating areas
  • Integration of station with both sides of city
  • Improvement of station building
  • Improvement of waiting halls, toilets, sitting arrangement, water booths
  • Provision of wider foot over bridge/subway to commensurate with passenger traffic
  • Provision of lifts/escalators/ramps
  • Improvement of platform surface and provision of platform shelter
  • Provision of kiosks for local products through schemes like ‘One Station One Product’
  • Parking development
  • Amenities for Divyangjans
  • Better passenger information systems
  • Provision of air concourse, executive lounges, Multimodal integration, landscaping, etc.

The scheme also envisages sustainable and environment friendly solutions etc. as per necessity, phasing and feasibility and creation of city centre at the station in the long term.

So far, 1,340 stations have been identified for development under this scheme, out of which 4 stations, are located in Jammu and Kashmir. The names of stations identified for development under Amrit Bharat Station Scheme in Jammu and Kashmir are as following:

State/UT No. of Stations Name of Stations
UT of Jammu and Kashmir 04 Budgam, Jammu Tawi, Martyr Captain Tushar Mahajan, Shri Mata Vaishno Devi Katra

 

The activities for development at stations of Jammu and Kashmir have been taken up at good pace and progress of the stations is as given below:

  • Budgam station: The works of improvement of circulating area, parking and approach road have been completed. The works of 12 m wide foot over bridge, improvement of station building and new waiting & executive lounge with booking counters have been taken up.
  • Jammu Tawi station: The works of new station building at second entry, development of circulating area, parking, new platforms, platform shelter, electrical sub-station and entrance ramp have been completed. The works of dismantling of old station building at main entry, foot over bridges and air concourse have been taken up.
  • Martyr Captain Tushar Mahajan station: The works of improvement of station building, improvement of circulating area, improvement of parking, approach road, toilets, improvement of waiting rooms, entrance porch and signage have been completed. The works of platform shelter, improvement of platform surface and 6 m wide foot over bridge have been taken up.
  • Shri Mata Vaishno Devi Katra station is under master planning stage.

Master Planning is an iterative process requiring optimization and the time frame and other details for such optimization cannot be indicated at this stage.

Further, development / redevelopment / upgradation / modernisation of stations on Indian Railways, including provision of passenger amenities is a continuous and ongoing process and works in this regard are undertaken as per requirement, subject to inter-se priority and availability of funds. Development / redevelopment / upgradation / modernisation of a station is carried out based on category of station/condition/traffic handled etc.

Development / upgradation / modernisation of stations including under Amrit Bharat Station Scheme is generally funded under Plan Head-53 ‘Customer Amenities’. The details of allocation and expenditure under Plan Head-53 are maintained Zonal Railway-wise and not station-wise or state-wise. Jammu and Kashmir is covered under the jurisdiction of one railway zone, namely Northern Railway. For this zone, an allocation of ₹ 7,944 crore has been made for the last five financial years and current financial year, out of which an expenditure (up to June, 2026) of ₹ 5,622 crore has been incurred so far.

Development / Upgradation of railway stations is a complex in nature involving safety of passengers & trains and requires various statutory clearances such as tree cutting, heritage, fire clearance, airport clearance etc. These stations are in operation since long, so brownfield work challenges are being faced, such as shifting of utilities (involving water/sewage lines, optical fibre cables, gas pipelines, power/signal cables, etc.), infringements, operation of trains without hindering passenger movement, speed restrictions due to works carried out in close proximity of the tracks and near to high voltage power lines, etc. and these factors affect the progress of work and completion time.

Indian Railways has a well established mechanism to monitor implementation of projects including their reviews, inspection and check for quality of works. Works are carried out adhering to the standards and specifications as laid down in various codes and manuals. Inspections and checks are carried out from time to time by various agencies and officials as per laid down instructions and actions for correction including damages are taken immediately. This is a continuous and ongoing process.

ROBs/RUBs:

Sanctioning of works of Road over Bridge (ROB)/Road under Bridge (RUB) in lieu of Level crossings (LCs) is a continuous and dynamic process of Indian Railway. Such works are prioritised and taken up on the basis of their impact on safety in train operations, mobility of trains & impact for road users and feasibility etc.

No. of ROBs/ RUBs constructed on Indian Railways during the period 2004-14 viz- a-viz  2014-26 (Upto May’26) is as under:

  Period ROBs/ RUBs constructed
2004-14 4,148 Nos.
2014-26 (Upto May’26) 14,451 Nos. ( 16 Nos. in the Union Territory of Jammu & Kashmir)

As on 01.06.2026, 4,993 Nos. ROB / RUB works are sanctioned at a cost of approx. ₹ 1,17,492 Cr on Indian Railways which are at various stages of planning and execution.

As on date, 195 Nos. of Road Over Bridges (ROBs)/Road Under Bridges (RUBs) exist in the Union Territory of Jammu & Kashmir. Further, 02 Nos. of ROB works have been sanctioned at a cost of approx. ₹87 Cr in the Union Territory of Jammu & Kashmir which are at various stages of planning and execution.

Completion & commissioning of ROB/RUB works depends on various factors like cooperation of  State Governments in giving  consent for closure of LC,  fixing of approach alignment, approval of General Arrangement Drawing (GAD), land acquisition, removal of encroachment, shifting of infringing utilities, statutory clearances from various authorities,  law and order situation in the area of project / work sites,  duration of working season in a year for the particular project / area  due to climatic conditions etc.  All these factors affect the completion time of the projects / works.

Further, Railways have taken following measures to expedite the progress of work:

i.  Joint survey with concerned State Govt./Road Owning Authority is done before finalizing the General Arrangement Drawing  (GAD) to ensure smooth execution.

ii.      Periodic meetings of Railway & State Government officials are done to resolve various issues related to ROB/RUB works.

iii.    Standardization of superstructure and substructure drawings for various combinations of span, skewness and width of road on the Railway portion has been done to avoid delays during the design approval. This has been issued in the form of a compendium, which can be directly adopted for Road Over Bridge across Railway lines for expeditious planning.

The details of allocation/Revised Estimate (RE) and expenditure for ROB/RUB works Under Plan Head (PH)-30 are maintained Zonal Railway-wise and not State-wise/District-wise. Jammu & Kashmir is covered under the jurisdiction of Northern Railway. This zone has been allocated a total of ₹ 763 Cr under PH-30 for financial year i.e. 2026-27. The expenditure incurred under PH-30 by this zone during year 2026-27 (up to May’ 2026) is ₹ 229 Cr.

Electrification:

Electrification of railway network on Indian Railways has been taken up in mission mode.  So far, about 99.6% of Broad Gauge (BG) network has been electrified. The electrification in remaining network has been taken up. Electrification carried out during 2014-26 and before 2014 is as under:

Period Route Kilometre
Before 2014 (about 60 years) 21,801
2014-26 48,072

 

In Jammu & Kashmir, entire existing BG network has been electrified. Further, all new line/multi-tracking projects are being sanctioned and constructed with electrification.

Gati Shakti Multi-Modal Cargo Terminal (GCT) :

“In order to encourage setting up of cargo terminals through private investment, ‘Gati Shakti Multi-Modal Cargo Terminal (GCT)’ policy has been launched. Location of the GCTs is decided on the basis of demand from industry, potential of Cargo traffic, availability of railway infrastructure and overall logistics potential of the area.

So far, 142 Gati Shakti Cargo Terminals (GCTs) have been commissioned, including 01 GCT in Samba district of Jammu & Kashmir. The 142 commissioned GCTs have an estimated freight handling capacity of 224 million tonnes per annum (MTPA). The policy has mobilized private investment of approximately ₹10,000 crore through these GCTs. Freight handled at these GCTs during 2025-26 is 146 MT.

In addition, In-Principle Approvals (IPAs) have been granted for the development of GCTs at 310 more locations, including 3 locations of Jammu & Kashmir i.e. in Kathua, Anantnag and Jammu districts.

Strengthening of Signalling System :

Indian Railway is continuously modernizing current infrastructure of its signalling system as under:

1.  Electrical/Electronic Interlocking Systems with centralized operation of points and signals in place of old mechanical signalling have been provided at 6671 stations as on 30.06.2026, out of which Electronic Interlocking have been provided at 3954 stations over Indian Railway, including 11 stations with Electronic Interlocking in five districts (Samba-1, Reasi-4, Ramban-3, Kathua-1 & Jammu-2) of Jammu & Kashmir during last 5 years.

2.     Complete Track Circuiting of stations to enhance safety by verification of track occupancy by electrical means has been provided at 6671 stations up to 30.06.2026 over Indian Railway, including 11 stations in five districts (Samba-1, Reasi-4, Ramban-3, Kathua-1 & Jammu-2) of Jammu & Kashmir during last 5 years.

3.    Axle counters for automatic clearance of Block Section, BPAC (Block Proving Axle Counter) are provided to ensure complete arrival of train without manual intervention before granting line clear to receive next train and to reduce human element. These systems have been provided on 6085 Block Sections up to 30.06.2026 over Indian Railway, including 11 stations in five districts (Samba-1, Reasi-4, Ramban-3, Kathua-1 & Jammu-2) of Jammu & Kashmir during last 5 years.

4.  Kavach is an indigenously developed Automatic Train Protection (ATP) system. Kavach is a highly technology intensive system, which requires safety certification of highest order (SIL-4). Kavach aids the Loco Pilot in running of trains within specified speed limits by automatic application of brakes in case Loco Pilot fails to do so.Kavach was adopted as National ATP system in July, 2020. Based on deployment of Kavach version 3.2 on 1465 RKm on South Central Railway and experience gained, further improvements were made. Finally, Kavach specification version 4.0 was approved by RDSO on 16.07.2024.

After extensive and elaborate trials, Kavach Version 4.0 has been successfully commissioned on 2633 Route Kilometres as on 31.07.2026, covering the high density Delhi- Mumbai and Delhi- Howrah routes over Indian Railway. Kavach works have been sanctioned for about 401 Rkm on following sections passing through Jammu & Kashmir:

·         Kathua–Jammu Tawi (76 RKm),

·         Jammu Tawi–Shri Mata Vaishno Devi Katra (78 RKm),

·         Katra – Banihal (112Rkm),

·         Banihal–Baramulla (135 RKm).

Train Services:

As the railway network straddles across  boundaries of States/Union Territories, trains are introduced across such boundaries as per network requirement. However, Indian Railways (IR) constantly endeavour to improve connectivity for the travelling passengers.

Indian Railways (IR) have introduced the following 04 pairs of Vande Bharat Express, which are catering to the needs of passengers of important stations like Jammu Tawi, Shri Mata Vaishno Devi Katra and Badgam located within the jurisdiction of  Union Territory of Jammu & Kashmir:

 

SN Train No. & Name
1. 26405/26406 Amritsar-Shri Mata Vaishno Devi Katra Vande Bharat Express
2. 26401/26402 Jammu Tawi-Srinagar Vande Bharat Express
3. 26403/26404 Jammu Tawi-Srinagar Vande Bharat Express
4. 22477/22478 New Delhi-Shri Mata Vaishno Devi Katra Vande Bharat Express

 

Further, it has been decided to introduce train service between Shri Mata Vaishno Devi Katra and Badgam viz. 14687/14688 Shri Mata Vaishno Devi Katra-Badgam Express.

Apart from these, IR has also undertaken to extend the following services to MCTM Udhampur:

SN Train No. & Name
1. Extension of 12549/12550 Durg-Jammu Tawi Express upto Udhampur
2. Extension of 22941/22942 Indore-Jammu Tawi Express upto Udhampur
3. Extension of 18215/18216 Durg-Jammu Tawi Express upto Udhampur

 

Accordingly, Jammu Tawi station is presently served by 114 train services while MCTM Udhampur station is served by 58 train services.Similarly, Shri Mata Vaishno Devi Katra station is served by 46 train services, Srinagar is served by 16 train services and Budgam is served by 19 train services. The lists of trains serving these stations are as under:

Trains serving Jammu Tawi station

SN Train No. and Name
1 26401 Jammu Tawi-Srinagar Vande Bharat Express
2 26402 Srinagar-Jammu Tawi Vande Bharat Express
3 26403 Jammu Tawi-Srinagar Vande Bharat Express
4 26404 Srinagar-Jammu Tawi Vande Bharat Express
5 26405 Amritsar-Shri Mata Vaishno Devi Katra Vande Bharat Express
6 26406 Shri Mata Vaishno Devi Katra-Amritsar Vande Bharat Express
7 22477 New Delhi-Shri Mata Vaishno Devi Katra Vande Bharat Express
8 22478 Shri Mata Vaishno Devi Katra-New Delhi Vande Bharat Express
9 22439 New Delhi-Shri Mata Vaishno Devi Katra Vande Bharat Express
10 22440 Shri Mata Vaishno Devi Katra-New Delhi Vande Bharat Express
11 12425 New Delhi-Jammu Tawi Rajdhani Express
12 12426 Jammu Tawi-New Delhi Rajdhani Express
13 12265 Delhi Sarai Rohilla-Jammu Tawi Duronto Express
14 12266 Jammu Tawi-Delhi Sarai Rohilla Duronto Express
15 11077 Pune Jn-Jammu Tawi Express
16 11078 Jammu Tawi-Pune Jn Express
17 11449 Jabalpur-Shri Mata Vaishno Devi Katra Express
18 11450 Shri Mata Vaishno Devi Katra-Jabalpur Express
19 12207 Kathgodam-Jammu Tawi Garib Rath Express
20 12208 Jammu Tawi-Kathgodam Garib Rath Express
21 12237 Varanasi-Jammu Tawi Express
22 12238 Jammu Tawi-Varanasi Express
23 12355 Patna-Jammu Tawi Express
24 12356 Jammu Tawi-Patna Express
25 12413 Ajmer-Jammu Tawi Express
26 12414 Jammu Tawi-Ajmer Express
27 12445 New Delhi-Shri Mata Vaishno Devi Katra Express
28 12446 Shri Mata Vaishno Devi Katra-New Delhi Express
29 12469 Kanpur Central-Jammu Tawi Express
30 12470 Jammu Tawi-Kanpur Central Express
31 12471 Bandra (T)-Shri Mata Vaishno Devi Katra Express
32 12472 Shri Mata Vaishno Devi Katra-Bandra (T) Express
33 12473 Gandhidham-Shri Mata Vaishno Devi Katra Express
34 12474 Shri Mata Vaishno Devi Katra-Gandhidham Express
35 12475 Hapa-Shri Mata Vaishno Devi Katra Express
36 12476 Shri Mata Vaishno Devi Katra-Hapa Express
37 12477 Jamnagar-Shri Mata Vaishno Devi Katra Express
38 12478 Shri Mata Vaishno Devi Katra-Jamnagar Express
39 12549 Durg-Mctm Udhampur Express
40 12550 Mctm Udhampur-Durg Express
41 12587 Gorakhpur Jn-Jammu Tawi Express
42 12588 Jammu Tawi-Gorakhpur Jn Express
43 12751 Hazur Sahib Nanded-Jammu Tawi Express
44 12752 Jammu Tawi-Hazur Sahib Nanded Express
45 12919 Dr. Ambedkar Nagar-Shri Mata Vaishno Devi Katra Express
46 12920 Shri Mata Vaishno Devi Katra-Dr. Ambedkar Nagar Express
47 13041 Howrah-Jammu Tawi Express
48 13042 Jammu Tawi-Howrah Express
49 13151 Kolkata-Jammu Tawi Express
50 13152 Jammu Tawi-Kolkata Express
51 14503 Kalka-Shri Mata Vaishno Devi Katra Express
52 14504 Shri Mata Vaishno Devi Katra-Kalka Express
53 14605 Yog Nagari Rishikesh-Jammu Tawi Express
54 14606 Jammu Tawi-Yog Nagari Rishikesh Express
55 14609 Yog Nagari Rishikesh-Shri Mata Vaishno Devi Katra Express
56 14610 Shri Mata Vaishno Devi Katra-Yog Nagari Rishikesh Express
57 14611 Ghazipur City-Shri Mata Vaishno Devi Katra Express
58 14612 Shri Mata Vaishno Devi Katra-Ghazipur City Express
59 14661 Barmer-Jammu Tawi Express
60 14662 Jammu Tawi-Barmer Express
61 14691 Barauni-Jammu Tawi Express
62 14692 Jammu Tawi-Barauni Express
63 14803 Bhagat Ki Kothi-Jammu Tawi Express
64 14804 Jammu Tawi-Bhagat Ki Kothi Express
65 15097 Bhagalpur-Jammu Tawi Express
66 15098 Jammu Tawi-Bhagalpur Express
67 15651 Guwahati-Jammu Tawi Express
68 15652 Jammu Tawi-Guwahati Express
69 15653 Guwahati-Jammu Tawi Express
70 15654 Jammu Tawi-Guwahati Express
71 15655 Kamakhya-Shri Mata Vaishno Devi Katra Express
72 15656 Shri Mata Vaishno Devi Katra-Kamakhya Express
73 16031 Mgr Chennai Central-Shri Mata Vaishno Devi Katra Express
74 16032 Shri Mata Vaishno Devi Katra-Mgr Chennai Central Express
75 16317 Kanniyakumari-Shri Mata Vaishno Devi Katra Express
76 16318 Shri Mata Vaishno Devi Katra-Kanniyakumari Express
77 16787 Tirunelveli Jn-Shri Mata Vaishno Devi Katra Express
78 16788 Shri Mata Vaishno Devi Katra-Tirunelveli Jn Express
79 18101 Tatanagar Jn-Jammu Tawi Express
80 18102 Jammu Tawi-Tatanagar Jn Express
81 18309 Sambalpur-Jammu Tawi Express
82 18310 Jammu Tawi-Sambalpur Express
83 19027 Bandra (T)-Jammu Tawi Express
84 19028 Jammu Tawi-Bandra (T) Express
85 19107 Bhavnagar-MCTM Udhampur Express
86 19108 MCTM Udhampur-Bhavnagar Express
87 19223 Sabarmati-Jammu Tawi Express
88 19224 Jammu Tawi-Sabarmati Express
89 19415 Sabarmati-Shri Mata Vaishno Devi Katra Express
90 19416 Shri Mata Vaishno Devi Katra-Sabarmati Express
91 19803 Kota-Shri Mata Vaishno Devi Katra Express
92 19804 Shri Mata Vaishno Devi Katra-Kota Express
93 20433 Subedarganj-Shri Mata Vaishno Devi Katra Express
94 20434 Shri Mata Vaishno Devi Katra-Subedarganj Express
95 20847 Durg-MCTM Udhampur Express
96 20848 MCTM Udhampur-Durg Express
97 20985 Kota-MCTM Udhampur Express
98 20986 MCTM Udhampur-Kota Express
99 22317 Sealdah-Jammu Tawi Express
100 22318 Jammu Tawi-Sealdah Express
101 22401 Delhi Sarai Rohilla-Mctm Udhampur Express
102 22402 MCTM Udhampur-Delhi Sarai Rohilla Express
103 22431 Subedarganj-MCTM Udhampur Express
104 22432 MCTM Udhampur-Subedarganj Express
105 22461 New Delhi-Shri Mata Vaishno Devi Katra Express
106 22462 Shri Mata Vaishno Devi Katra-New Delhi Express
107 22705 Tirupati-Jammu Tawi Express
108 22706 Jammu Tawi-Tirupati Express
109 22941 Indore-MCTM Udhampur Express
110 22942 MCTM Udhampur-Indore Express
111 74906 MCTM Udhampur-Pathankot DEMU
112 74907 Pathankot-MCTM Udhampur DEMU
113 74909 Pathankot-MCTM Udhampur DEMU
114 74910 MCTM Udhampur-Pathankot DEMU

 

Trains serving MCTM Udhampur station:

SN Train No. and Name
1 26401 Jammu Tawi-Srinagar Vande Bharat Express
2 26402 Srinagar-Jammu Tawi Vande Bharat Express
3 26403 Jammu Tawi-Srinagar Vande Bharat Express
4 26404 Srinagar-Jammu Tawi Vande Bharat Express
5 22477 New Delhi-Shri Mata Vaishno Devi Katra Vande Bharat Express
6 22478 Shri Mata Vaishno Devi Katra-New Delhi Vande Bharat Express
7 11449 Jabalpur-Shri Mata Vaishno Devi Katra Express
8 11450 Shri Mata Vaishno Devi Katra-Jabalpur Express
9 12445 New Delhi-Shri Mata Vaishno Devi Katra Express
10 12446 Shri Mata Vaishno Devi Katra-New Delhi Express
11 12471 Bandra (T)-Shri Mata Vaishno Devi Katra Express
12 12472 Shri Mata Vaishno Devi Katra-Bandra (T) Express
13 12473 Gandhidham-Shri Mata Vaishno Devi Katra Express
14 12474 Shri Mata Vaishno Devi Katra-Gandhidham Express
15 12475 Hapa-Shri Mata Vaishno Devi Katra Express
16 12476 Shri Mata Vaishno Devi Katra-Hapa Express
17 12477 Jamnagar-Shri Mata Vaishno Devi Katra Express
18 12478 Shri Mata Vaishno Devi Katra-Jamnagar Express
19 12549 Durg-MCTM Udhampur Express
20 12550 MCTM Udhampur-Durg Express
21 12919 Dr. Ambedkar Nagar-Shri Mata Vaishno Devi Katra Express
22 12920 Shri Mata Vaishno Devi Katra-Dr. Ambedkar Nagar Express
23 14503 Kalka-Shri Mata Vaishno Devi Katra Express
24 14504 Shri Mata Vaishno Devi Katra-Kalka Express
25 14609 Yog Nagari Rishikesh-Shri Mata Vaishno Devi Katra Express
26 14610 Shri Mata Vaishno Devi Katra-Yog Nagari Rishikesh Express
27 15655 Kamakhya-Shri Mata Vaishno Devi Katra Express
28 15656 Shri Mata Vaishno Devi Katra-Kamakhya Express
29 16031 Mgr Chennai Central-Shri Mata Vaishno Devi Katra Express
30 16032 Shri Mata Vaishno Devi Katra-Mgr Chennai Central Express
31 16317 Kanniyakumari-Shri Mata Vaishno Devi Katra Express
32 16318 Shri Mata Vaishno Devi Katra-Kanniyakumari Express
33 16787 Tirunelveli-Shri Mata Vaishno Devi Katra Express
34 16788 Shri Mata Vaishno Devi Katra-Tirunelveli Express
35 19107 Bhavnagar-MCTM Udhampur Express
36 19108 MCTM Udhampur-Bhavnagar Express
37 19415 Sabarmati-Shri Mata Vaishno Devi Katra Express
38 19416 Shri Mata Vaishno Devi Katra-Sabarmati Express
39 19803 Kota-Shri Mata Vaishno Devi Katra Express
40 19804 Shri Mata Vaishno Devi Katra-Kota Express
41 20433 Subedarganj-Shri Mata Vaishno Devi Katra Express
42 20434 Shri Mata Vaishno Devi Katra-Subedarganj Express
43 20847 Durg-MCTM Udhampur Express
44 20848 MCTM Udhampur-Durg Express
45 20985 Kota-MCTM Udhampur Express
46 20986 MCTM Udhampur-Kota Express
47 22401 Delhi Sarai Rohilla-MCTM Udhampur Express
48 22402 MCTM Udhampur-Delhi Sarai Rohilla Express
49 22431 Subedarganj-MCTM Udhampur Express
50 22432 MCTM Udhampur-Subedarganj Express
51 22461 New Delhi-Shri Mata Vaishno Devi Katra Express
52 22462 Shri Mata Vaishno Devi Katra-New Delhi Express
53 22941 Indore-MCTM Udhampur Express
54 22942 MCTM Udhampur-Indore Express
55 74906 MCTM Udhampur-Pathankot DEMU
56 74907 Pathankot-MCTM Udhampur DEMU
57 74909 Pathankot-MCTM Udhampur DEMU
58 74910 MCTM Udhampur-Pathankot DEMU

 

Trains serving Shri Mata Vaishno Devi Katra station:

SN Train Name and No.
1 22439 New Delhi – Shri Mata Vaishno Devi Katra Vande Bharat Express
2 22440 Shri Mata Vaishno Devi Katra – New Delhi Vande Bharat Express
3 26405 Amritsar – Shri Mata Vaishno Devi Katra Vande Bharat Express
4 26406 Shri Mata Vaishno Devi Katra – Amritsar Vande Bharat Express
5 22477 New Delhi – Shri Mata Vaishno Devi Katra Vande Bharat Express
6 22478 Shri Mata Vaishno Devi Katra – New Delhi Vande Bharat Express
7 11449 Jabalpur -Shri Mata Vaishno Devi Katra Express
8 11450 Shri Mata Vaishno Devi Katra – Jabalpur Express
9 12445 New Delhi- Shri Mata Vaishno Devi Katra Express
10 12446 Shri Mata Vaishno Devi Katra – New Delhi Express
11 12471 Bandra (T)- Shri Mata Vaishno Devi Katra Express
12 12472 Shri Mata Vaishno Devi Katra – Bandra (T) Express
13 12473 Gandhidham- Shri Mata Vaishno Devi Katra Express
14 12474 Shri Mata Vaishno Devi Katra – Gandhidham Bg Express
15 12475 Hapa -Shri Mata Vaishno Devi Katra Express
16 12476 Shri Mata Vaishno Devi Katra – Hapa Express
17 12477 Jamnagar -Shri Mata Vaishno Devi Katra Express
18 12478 Shri Mata Vaishno Devi Katra – Jamnagar Express
19 12919 Dr. Ambedkar Nagar – Shri Mata Vaishno Devi Katra Express
20 12920 Shri Mata Vaishno Devi Katra – Dr. Ambedkar Nagar Express
21 14503 Kalka -Shri Mata Vaishno Devi Katra Express
22 14504 Shri Mata Vaishno Devi Katra – Kalka Express
23 14609 Yog Nagari Rishikesh – Shri Mata Vaishno Devi Katra Express
24 14610 Shri Mata Vaishno Devi Katra – Yog Nagari Rishikesh Express
25 14611 Ghazipur City – Shri Mata Vaishno Devi Katra Express
26 14612 Shri Mata Vaishno Devi Katra – Ghazipur City Express
27 15655 Kamakhya -Shri Mata Vaishno Devi Katra Express
28 15656 Shri Mata Vaishno Devi Katra – Kamakhya Express
29 16031 MGR Chennai Central  – Shri Mata Vaishno Devi Katra Express
30 16032 Shri Mata Vaishno Devi Katra -MGR Chennai Central  Express
31 16317 Kanniyakumari – Shri Mata Vaishno Devi Katra Express
32 16318 Shri Mata Vaishno Devi Katra – Kanniyakumari Express
33 16787 Tirunelveli Jn – Shri Mata Vaishno Devi Katra Express
34 16788 Shri Mata Vaishno Devi Katra – Tirunelveli Jn Express
35 19415 Sabarmati-Shri Mata Vaishno Devi Katra Express
36 19416 Shri Mata Vaishno Devi Katra – Sabarmati Express
37 19803 Kota-Shri Mata Vaishno Devi Katra Express
38 19804 Shri Mata Vaishno Devi Katra – Kota Express
39 20433 Subedarganj – Shri Mata Vaishno Devi Katra Express
40 20434 Shri Mata Vaishno Devi Katra – Subedarganj Express
41 22461 New Delhi – Shri Mata Vaishno Devi Katra Express
42 22462 Shri Mata Vaishno Devi Katra – New Delhi Express
43 26401 Jammu Tawi  – Srinagar Vande Bharat Express
44 26402 Srinagar -Jammu Tawi Vande Bharat Express
45 26403 Jammu Tawi  – Srinagar Vande Bharat Express
46 26404 Srinagar -Jammu Tawi Vande Bharat Express

 

Trains serving Badgam station:

SN Train Name and No.
1 64651 Sangaldan – Baramula MEMU
2 64652 Baramula -Sangaldan MEMU
3 74613 Budgam – Baramula DEMU
4 74614 Baramula -Banihal DEMU
5 74615 Banihal -Baramula DEMU
6 74617 Banihal -Budgam DEMU
7 74618 Baramula -Budgam DEMU
8 74619 Sangaldan- Baramula DEMU
9 74620 Baramula -Sangaldan DEMU
10 74621 Budgam -Baramula DEMU
11 74622 Baramula -Banihal DEMU
12 74623 Banihal -Baramula DEMU
13 74624 Baramula -Budgam DEMU
14 74625 Banihal -Baramula DEMU
15 74626 Baramula -Banihal DEMU
16 74628 Budgam -Banihal DEMU
17 74630 Baramula -Budgam DEMU
18 74631 Budgam -Baramula DEMU
19 74632 Baramula -Budgam DEMU

 

Trains serving Srinagar station:

SN Train Name and No.
1 26401 Jammu Tawi- Srinagar Vande Bharat Express
2 26402 Srinagar – Jammu Tawi Vande Bharat Express
3 26403 Jammu Tawi- Srinagar Vande Bharat Express
4 26404 Srinagar – Jammu Tawi Vande Bharat Express
5 64651 Sangaldan – Baramula MEMU
6 64652 Baramula – Sangaldan MEMU
7 74614 Baramula – Banihal DMU
8 74615 Banihal – Baramula DMU
9 74617 Banihal – Budgam DMU
10 74619 Sangaldan – Baramula DMU
11 74620 Baramula – Sangaldan DMU
12 74622 Baramula – Banihal DMU
13 74623 Banihal – Baramula DMU
14 74625 Banihal – Baramula DMU
15 74626 Baramula – Banihal DMU
16 74628 Budgam – Banihal DMU

 

Besides, introduction of new train services, which is an  on-going process, depends on various factors which include-

●       Capacity of that section

●       Availability of path

●       Availability of required rolling stock

●       Availability of matching infrastructure for rolling stock

●  Maintenance requirement of railway tracks and other assets.

Occupancy and the traffic requirement of the section.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Popular

spot_imgspot_img
[tds_leads title_text="Subscribe" input_placeholder="Email address" btn_horiz_align="content-horiz-center" pp_checkbox="yes" pp_msg="SSd2ZSUyMHJlYWQlMjBhbmQlMjBhY2NlcHQlMjB0aGUlMjAlM0NhJTIwaHJlZiUzRCUyMiUyMyUyMiUzRVByaXZhY3klMjBQb2xpY3klM0MlMkZhJTNFLg==" f_title_font_family="653" f_title_font_size="eyJhbGwiOiIyNCIsInBvcnRyYWl0IjoiMjAiLCJsYW5kc2NhcGUiOiIyMiJ9" f_title_font_line_height="1" f_title_font_weight="700" f_title_font_spacing="-1" msg_composer="success" display="column" gap="10" input_padd="eyJhbGwiOiIxNXB4IDEwcHgiLCJsYW5kc2NhcGUiOiIxMnB4IDhweCIsInBvcnRyYWl0IjoiMTBweCA2cHgifQ==" input_border="1" btn_text="I want in" btn_tdicon="tdc-font-tdmp tdc-font-tdmp-arrow-right" btn_icon_size="eyJhbGwiOiIxOSIsImxhbmRzY2FwZSI6IjE3IiwicG9ydHJhaXQiOiIxNSJ9" btn_icon_space="eyJhbGwiOiI1IiwicG9ydHJhaXQiOiIzIn0=" btn_radius="3" input_radius="3" f_msg_font_family="185" f_msg_font_size="eyJhbGwiOiIxMyIsInBvcnRyYWl0IjoiMTIifQ==" f_msg_font_weight="600" f_msg_font_line_height="1.4" f_input_font_family="653" f_input_font_size="eyJhbGwiOiIxNCIsImxhbmRzY2FwZSI6IjEzIiwicG9ydHJhaXQiOiIxMiJ9" f_input_font_line_height="1.2" f_btn_font_family="653" f_input_font_weight="500" f_btn_font_size="eyJhbGwiOiIxMyIsImxhbmRzY2FwZSI6IjEyIiwicG9ydHJhaXQiOiIxMSJ9" f_btn_font_line_height="1.2" f_btn_font_weight="700" f_pp_font_family="653" f_pp_font_size="eyJhbGwiOiIxMyIsImxhbmRzY2FwZSI6IjEyIiwicG9ydHJhaXQiOiIxMSJ9" f_pp_font_line_height="1.2" pp_check_color="#000000" pp_check_color_a="#000000" pp_check_color_a_h="#c11f1f" f_btn_font_transform="uppercase" tdc_css="eyJhbGwiOnsibWFyZ2luLWJvdHRvbSI6IjQwIiwiZGlzcGxheSI6IiJ9LCJsYW5kc2NhcGUiOnsibWFyZ2luLWJvdHRvbSI6IjM1IiwiZGlzcGxheSI6IiJ9LCJsYW5kc2NhcGVfbWF4X3dpZHRoIjoxMTQwLCJsYW5kc2NhcGVfbWluX3dpZHRoIjoxMDE5LCJwb3J0cmFpdCI6eyJtYXJnaW4tYm90dG9tIjoiMzAiLCJkaXNwbGF5IjoiIn0sInBvcnRyYWl0X21heF93aWR0aCI6MTAxOCwicG9ydHJhaXRfbWluX3dpZHRoIjo3Njh9" msg_succ_radius="2" btn_bg="#000000" btn_bg_h="#0a3670" title_space="eyJwb3J0cmFpdCI6IjEyIiwibGFuZHNjYXBlIjoiMTQiLCJhbGwiOiIxOCJ9" msg_space="eyJsYW5kc2NhcGUiOiIwIDAgMTJweCJ9" btn_padd="eyJsYW5kc2NhcGUiOiIxMiIsInBvcnRyYWl0IjoiMTBweCJ9" msg_padd="eyJwb3J0cmFpdCI6IjZweCAxMHB4In0="]

More like this
Related