spot_imgspot_img
spot_img

Power shutdown

Date:

Srinagar, Nov 02: Superintending Engineer (Distribution) JPDCL, O&M Circle Kathua has informed that to carry out the branch cutting of trees under the corridor of 66 KV Sarna-Kathua Line, the power supply to Keerian Local, Industry (Crushers), CNC Keerian and adjoining areas will remain affected on November 05 from 9 am to 2 pm. 
Similarly, to carry out the branch cutting of trees under the corridor of 66 KV Pathankot-Kathua Line, the shutdown of shutdown of 66 KV Pathankot-Kathua line is being observed.
During the shutdown, the affected load shall be accommodated on Grid Station Kathua.
Meanwhile, to execute reconductoring work with Dog/Rabbit and tapping of 11 KV new line in IPDS /PMDP Scheme, the power supply to Garib Basti, Lakhanpur Bazar, Goplden Gate, Mahabti, Kattal Chowk etc will remain affected on November 03, 05, 07, 09 from 9 am to 2 pm.
However, for testing of CT/PT Units, the power supply to all Industry Units on 11 KV Industry-II, IGC-I Phase-I, Samba will remain affected on November 05 from 12 noon to 2 pm.
Similarly, the power supply to all Industry Units on 11 KV Industry-V, IGC-I Phase-I, Samba will remain affected on November 05 from 1 pm to 4 pm.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Popular

spot_imgspot_img

Subscribe

More like this
Related

War Is Not Romantic, Bollywood Movie, Says Ex-Army Chief Naravane

Pune, May 12 : Former Indian Army chief General...

 Everything Has Changed, Yet Nothing Has : Omar Abdullah on Lingering Indo-Pak Tensions

Pakistan Re-Internationalizes Kashmir IssueMission Partially Done'— Full Justice in...

Goli Ka Jawaab Gola : PM Modi’s Strong Directions To Armed Forces

New Delhi, May 11: Prime Minister Narendra Modi has...

Defence Minister expresses gratitude to armed forces for delivering justice to families of Pahalgam attack victims

‘Under PM Modi’s leadership 'Naya Bharat' taking effective steps...